Home » About IHC Merwede » News

News

April 2008

Announcement
The name giving ceremony and launching of the 5,600m³ trailing suction hopper dredger CRESTWAY

On Friday 16 May 2008 at 15.00 hrs the 5,600m³ trailing suction hopper dredger CRESTWAY, yardnumber 1250, will be launched at the shipyard of IHC Dredgers B.V., Smitweg...

Tidel turbine shaftseal built by IHC Lagersmit exceeds expectations
March 2008

Press release
Tidel turbine shaftseal built by IHC Lagersmit exceeds expectations

IHC Lagersmit developed a special design of the SUPREME shaftseal for a tidal turbine in the Kval Sound fjord (near Hammerfest) in Norway. This tidal turbine was the first prototype. Now after 4...

The name giving ceremony and launching of the Well Intervention Vessel WELL ENHANCER
March 2008

Announcement
The name giving ceremony and launching of the Well Intervention Vessel WELL ENHANCER

On Saturday 31 May 2008 at 15.10 hrs the Well Intervention Vessel WELL ENHANCER will be launched at the IHC Krimpen Shipyard, Schaardijk 24 in Krimpen aan den IJssel. This vessel is being...

March 2008

Press release
Technip NPV Contract – Major Coup for IHC’s Engineering Business

A major contract to provide a fully integrated pipelay system for Technip’s newbuild 194m pipelay vessel (NPV) has been awarded to IHC’s Engineering ...

March 2008

Press release
IHC Merwede acquires the Engineering Business

IHC Merwede acquired specialist design, engineering and construction company The Engineering Business (EB) on 7 March 2008. The company is based in Riding Mill, Northumberland, UK, and is dubbed the...

Displaying results 31 to 35 out of 58

< Previous

1

2

3

4

5

6

7

Next >

Joint effort IHC Merwede and DEME to develop forecasting model

IHC Merwede and the Belgian contractor DEME (Dredging, Environmental and Marine Engineering) are...

New production facility opens for IHC Metalix

The new IHC Metalix production facility opened on Friday, 7 November 2008. Mr. J. Kamminga, the...